Skip to content
AquaCensus

Public water system · TX2410057

Active

Leedo Manufacturing

At a glance

Leedo Manufacturing (PWSID TX2410057) is an active non-transient non-community water system in Wharton County, Texas. It reports serving 361 people through 5 service connections. Its primary water source is groundwater, and EPA lists it as privately owned. Of the 12 most recent violations in EPA's records, none is health-based, and the most recent began in June 2025.

Dataset updated . Source: EPA SDWIS/ECHO public records.

Population served

361

Service connections

5

Primary source

GW

Groundwater

System type

NTNCWS

Non-transient non-community water system

System record

PWSIDTX2410057
System typeNon-transient non-community water system
Activity statusActive
Population served361
Service connections5
Primary water sourceGroundwater
Owner typePrivate
Primacy agencyTX state drinking water program
City served—
StateTexas
ZIP—
CountyWharton County

How does Leedo Manufacturing compare with other water systems in Wharton County?

By EPA's size categories, Leedo Manufacturing is a very small system (500 people or fewer). Wharton County has 32 active public water systems. Its population served is about 61% below the county average of 918 people per system, and accounts for 1.2% of the 29,382 people reported by systems filed under the county. Across Texas, the 7,078 active systems average 4,789 people each. Nationally, the average active non-transient non-community water system reports serving 430 people, so Leedo Manufacturing is about 16% below that figure.

What does “non-transient non-community water system” mean?

A non-transient non-community water system regularly serves at least 25 of the same people for more than six months a year, but not where they live. Schools, factories, office buildings and hospitals with their own supply are typical examples. Texas has 862 active non-transient non-community water systems, 12% of the state's 7,078 active systems. Groundwater means the system draws its water from wells or springs fed by underground aquifers. 5,215 Texas systems (74%) list groundwater as their primary source.

Who owns and regulates Leedo Manufacturing?

EPA lists Leedo Manufacturing as privately owned. The TX state drinking water program is its primacy agency, the regulator with primary enforcement responsibility for the system under the Safe Drinking Water Act. 23 of the 32 active systems in Wharton County (72%) are also privately owned.

Does Leedo Manufacturing have drinking water violations?

Of the 12 most recent violations in EPA's records, none is health-based, and the most recent began in June 2025. The violations listed here began between January 2019 and June 2025. By type: 11 monitoring and reporting and 1 public notice, recordkeeping or other. The contaminants or rules involved are E. coli, Public Notice, Oxamyl and Picloram. EPA lists 10 as archived and 2 as resolved. Archived means the violation was not marked resolved but is more than five years past the end of the noncompliance period, so it no longer counts toward current compliance status. Resolved means at least one resolving action is on record: the system returned to compliance, the rule no longer applies, or no further action was needed.

BeganViolationContaminant or ruleHealth-basedStatus
2025-06-25Monitoring and reportingMonitoring, Source Water (GWR) · code 34E. colicode 3014NoResolved
2020-01-09Public notice, recordkeeping or otherPublic Notification Violation for NPDWR Violation · code 75Public Noticecode 7500NoResolved
2019-01-01Monitoring and reportingMonitoring, Regular · code 03Oxamylcode 2036NoArchived
2019-01-01Monitoring and reportingMonitoring, Regular · code 03Picloramcode 2040NoArchived
2019-01-01Monitoring and reportingMonitoring, Regular · code 03Dinosebcode 2041NoArchived
2019-01-01Monitoring and reportingMonitoring, Regular · code 03Dalaponcode 2031NoArchived
2019-01-01Monitoring and reportingMonitoring, Regular · code 03Aldicarbcode 2047NoArchived
2019-01-01Monitoring and reportingMonitoring, Regular · code 031,2-Dibromo-3-chloropropane (DBCP)code 2931NoArchived
2019-01-01Monitoring and reportingMonitoring, Regular · code 03Carbofurancode 2046NoArchived
2019-01-01Monitoring and reportingMonitoring, Regular · code 032,4-Dcode 2105NoArchived
2019-01-01Monitoring and reportingMonitoring, Regular · code 03Aldicarb sulfoxidecode 2043NoArchived
2019-01-01Monitoring and reportingMonitoring, Regular · code 03Ethylene dibromide (EDB)code 2946NoArchived

The 12 most recent violations in EPA's records, newest first.Labels and codes come from EPA's SDWIS reference tables. A monitoring or reporting violation means a required test or report was missed or late; it does not by itself mean a contaminant was found. "Health-based" marks violations of a legal limit or required treatment.

Leedo Manufacturing: frequently asked questions

Who runs Leedo Manufacturing?

Leedo Manufacturing (PWSID TX2410057) is a non-transient non-community water system privately owned. It is regulated by the TX state drinking water program.

How many people does Leedo Manufacturing serve?

Leedo Manufacturing reports serving 361 people through 5 service connections in Wharton County, Texas.

Where does Leedo Manufacturing get its water?

EPA SDWIS lists this system's primary water source as groundwater. Groundwater means the system draws its water from wells or springs fed by underground aquifers.

Does Leedo Manufacturing have any drinking water violations?

Of the 12 most recent violations in EPA's records, none is health-based, and the most recent began in June 2025. A monitoring or reporting violation means a required test or report was missed or late; it does not by itself mean a contaminant was found.

Is Leedo Manufacturing's water safe to drink?

AquaCensus shows EPA compliance records, not current water test results, so it cannot say whether the water is safe at a given moment. Of the 12 most recent violations in EPA's records, none is health-based, and the most recent began in June 2025. For current results, consult EPA ECHO, or the TX state drinking water program.

Where can I find Leedo Manufacturing's water quality report?

The annual Consumer Confidence Report requirement applies to community water systems. Leedo Manufacturing is a non-transient non-community water system, so it is not required to publish one; like every public water system, it must notify the people it serves about violations under EPA's public notification rules.

Other water systems in Wharton County

Water systemCountyPopulation servedTypeSource
City of El CampoWharton12,095CommunityGroundwater
City of WhartonWharton8,756CommunityGroundwater
Wharton County Wcid 2Wharton2,200CommunityGroundwater
Wharton County Wcid 1 LouiseWharton1,206CommunityGroundwater
Boling MwdWharton800CommunityGroundwater
Isaacson MUDWharton729CommunityPurchased groundwater

Related pages

Working with water-system records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: U.S. EPA Safe Drinking Water Information System (SDWIS) and SDWA violation records, via EPA ECHO, as published October 1, 2026 — AquaCensus refreshes it quarterly. See the methodology for how records are matched, cleaned and scored.

Cite as: AquaCensus, “Leedo Manufacturing, PWSID TX2410057, Texas”, https://aquacensus.com/water-systems/texas/leedo-manufacturing-tx2410057 (data as of October 1, 2026).