Public water system · TX0200779
ActiveMarquis Construction Yard
At a glance
Marquis Construction Yard (PWSID TX0200779) is an active non-transient non-community water system in Brazoria County, Texas. It reports serving 40 people through 5 service connections. Its primary water source is groundwater, and EPA lists it as privately owned. Of the 12 most recent violations in EPA's records, one is health-based, and the most recent began in April 2026.
Dataset updated . Source: EPA SDWIS/ECHO public records.
Population served
40
Service connections
5
Primary source
GW
Groundwater
System type
NTNCWS
Non-transient non-community water system
System record
How does Marquis Construction Yard compare with other water systems in Brazoria County?
By EPA's size categories, Marquis Construction Yard is a very small system (500 people or fewer). Brazoria County has 309 active public water systems. Its population served is well below the county average of 1,277 people per system, and accounts for less than 0.1% of the 394,490 people reported by systems filed under the county. Across Texas, the 7,078 active systems average 4,789 people each. Nationally, the average active non-transient non-community water system reports serving 430 people, so Marquis Construction Yard is well below that figure.
What does “non-transient non-community water system” mean?
A non-transient non-community water system regularly serves at least 25 of the same people for more than six months a year, but not where they live. Schools, factories, office buildings and hospitals with their own supply are typical examples. Texas has 862 active non-transient non-community water systems, 12% of the state's 7,078 active systems. Groundwater means the system draws its water from wells or springs fed by underground aquifers. 5,215 Texas systems (74%) list groundwater as their primary source.
Who owns and regulates Marquis Construction Yard?
EPA lists Marquis Construction Yard as privately owned. The TX state drinking water program is its primacy agency, the regulator with primary enforcement responsibility for the system under the Safe Drinking Water Act. 250 of the 309 active systems in Brazoria County (81%) are also privately owned.
Does Marquis Construction Yard have drinking water violations?
Of the 12 most recent violations in EPA's records, one is health-based, and the most recent began in April 2026. The violations listed here began between July 2024 and April 2026. By type: 7 monitoring and reporting, 3 public notice, recordkeeping or other, 1 reporting and 1 required treatment not met. The contaminant or rule involved most often is Lead and Copper Rule (3 of them). EPA lists 10 as resolved and 2 as unaddressed. Resolved means at least one resolving action is on record: the system returned to compliance, the rule no longer applies, or no further action was needed. Unaddressed means the violation is not resolved or archived and is not yet covered by formal enforcement.
| Began | Violation | Contaminant or rule | Health-based | Status |
|---|---|---|---|---|
| 2026-04-01 | Monitoring and reportingLead Consumer Notice · code 66 | Lead and Copper Rulecode 5000 | No | Unaddressed |
| 2025-09-29 | Monitoring and reportingLead Consumer Notice · code 66 | Lead and Copper Rulecode 5000 | No | Unaddressed |
| 2025-05-01 | Public notice, recordkeeping or otherPublic Notification Violation for NPDWR Violation · code 75 | Public Noticecode 7500 | No | Resolved |
| 2025-04-01 | Monitoring and reportingLead Consumer Notice · code 66 | Lead and Copper Rulecode 5000 | No | Resolved |
| 2025-03-06 | Public notice, recordkeeping or otherPublic Notification Violation for NPDWR Violation · code 75 | Public Noticecode 7500 | No | Resolved |
| 2025-02-06 | Public notice, recordkeeping or otherPublic Notification Violation for NPDWR Violation · code 75 | Public Noticecode 7500 | No | Resolved |
| 2024-10-17 | ReportingLSL Reporting · code 4G | Lead and Copper Rule Revisionscode 5200 | No | Resolved |
| 2024-10-17 | Required treatment not metLSL Inventory · code 2E | Lead and Copper Rule Revisionscode 5200 | Yes | Resolved |
| 2024-07-01 | Monitoring and reportingMonitoring, Regular · code 03 | Di(2-ethylhexyl) phthalatecode 2039 | No | Resolved |
| 2024-07-01 | Monitoring and reportingMonitoring, Regular · code 03 | Simazinecode 2037 | No | Resolved |
| 2024-07-01 | Monitoring and reportingMonitoring, Regular · code 03 | Lindane (gamma-BHC)code 2010 | No | Resolved |
| 2024-07-01 | Monitoring and reportingMonitoring, Regular · code 03 | Toxaphenecode 2020 | No | Resolved |
The 12 most recent violations in EPA's records, newest first.Labels and codes come from EPA's SDWIS reference tables. A monitoring or reporting violation means a required test or report was missed or late; it does not by itself mean a contaminant was found. "Health-based" marks violations of a legal limit or required treatment.
Marquis Construction Yard: frequently asked questions
Who runs Marquis Construction Yard?
Marquis Construction Yard (PWSID TX0200779) is a non-transient non-community water system privately owned. It is regulated by the TX state drinking water program.
How many people does Marquis Construction Yard serve?
Marquis Construction Yard reports serving 40 people through 5 service connections in Brazoria County, Texas.
Where does Marquis Construction Yard get its water?
EPA SDWIS lists this system's primary water source as groundwater. Groundwater means the system draws its water from wells or springs fed by underground aquifers.
Does Marquis Construction Yard have any drinking water violations?
Of the 12 most recent violations in EPA's records, one is health-based, and the most recent began in April 2026. A monitoring or reporting violation means a required test or report was missed or late; it does not by itself mean a contaminant was found.
Is Marquis Construction Yard's water safe to drink?
AquaCensus shows EPA compliance records, not current water test results, so it cannot say whether the water is safe at a given moment. Of the 12 most recent violations in EPA's records, one is health-based, and the most recent began in April 2026. For current results, consult EPA ECHO, or the TX state drinking water program.
Where can I find Marquis Construction Yard's water quality report?
The annual Consumer Confidence Report requirement applies to community water systems. Marquis Construction Yard is a non-transient non-community water system, so it is not required to publish one; like every public water system, it must notify the people it serves about violations under EPA's public notification rules.
Other water systems in Brazoria County
| Water system | County | Population served | Type | Source |
|---|---|---|---|---|
| City of Pearland | Brazoria | 125,828 | Community | Surface water |
| City of Lake Jackson | Brazoria | 27,314 | Community | Purchased surface water |
| City of Alvin | Brazoria | 26,244 | Community | Groundwater |
| City of Angleton | Brazoria | 19,429 | Community | Purchased surface water |
| City of Clute | Brazoria | 10,604 | Community | Purchased surface water |
| City of Freeport | Brazoria | 10,594 | Community | Purchased surface water |
Related pages
Working with water-system records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: U.S. EPA Safe Drinking Water Information System (SDWIS) and SDWA violation records, via EPA ECHO, as published October 1, 2026 — AquaCensus refreshes it quarterly. See the methodology for how records are matched, cleaned and scored.
Cite as: AquaCensus, “Marquis Construction Yard, PWSID TX0200779, Texas”, https://aquacensus.com/water-systems/texas/marquis-construction-yard-tx0200779 (data as of October 1, 2026).