Skip to content
AquaCensus

Public water system · SC0270678

Active

Camp Long Leadership Center (0270678)

At a glance

Camp Long Leadership Center (0270678) (PWSID SC0270678) is an active non-transient non-community water system in Aiken County, South Carolina. It reports serving 175 people through 42 service connections. Its primary water source is groundwater, and EPA lists it as privately owned. EPA's records list 9 violations for this system; none is health-based, and the most recent began in January 2025.

Dataset updated . Source: EPA SDWIS/ECHO public records.

Population served

175

Service connections

42

Primary source

GW

Groundwater

System type

NTNCWS

Non-transient non-community water system

System record

PWSIDSC0270678
System typeNon-transient non-community water system
Activity statusActive
Population served175
Service connections42
Primary water sourceGroundwater
Owner typePrivate
Primacy agencySC state drinking water program
City servedAiken
StateSouth Carolina
ZIP—
CountyAiken County

How does Camp Long Leadership Center (0270678) compare with other water systems in Aiken County?

By EPA's size categories, Camp Long Leadership Center (0270678) is a very small system (500 people or fewer). Aiken County has 65 active public water systems. Its population served is well below the county average of 2,413 people per system, and accounts for 0.1% of the 156,860 people reported by systems filed under the county. Across South Carolina, the 1,392 active systems average 3,511 people each. Nationally, the average active non-transient non-community water system reports serving 430 people, so Camp Long Leadership Center (0270678) is about 59% below that figure.

What does “non-transient non-community water system” mean?

A non-transient non-community water system regularly serves at least 25 of the same people for more than six months a year, but not where they live. Schools, factories, office buildings and hospitals with their own supply are typical examples. South Carolina has 82 active non-transient non-community water systems, 5.9% of the state's 1,392 active systems. Groundwater means the system draws its water from wells or springs fed by underground aquifers. 933 South Carolina systems (67%) list groundwater as their primary source.

Who owns and regulates Camp Long Leadership Center (0270678)?

EPA lists Camp Long Leadership Center (0270678) as privately owned. The SC state drinking water program is its primacy agency, the regulator with primary enforcement responsibility for the system under the Safe Drinking Water Act. 43 of the 65 active systems in Aiken County (66%) are also privately owned.

Does Camp Long Leadership Center (0270678) have drinking water violations?

EPA's records list 9 violations for this system; none is health-based, and the most recent began in January 2025. The violations listed here began between October 1991 and January 2025. By type: 7 monitoring and reporting, 1 reporting and 1 monitoring. The contaminant or rule involved most often is Total coliform bacteria (TCR) (6 of them). EPA lists 6 as archived and 3 as resolved. Archived means the violation was not marked resolved but is more than five years past the end of the noncompliance period, so it no longer counts toward current compliance status. Resolved means at least one resolving action is on record: the system returned to compliance, the rule no longer applies, or no further action was needed.

BeganViolationContaminant or ruleHealth-basedStatus
2025-01-01ReportingReport Sample Result/Fail Monitor (RTCR) · code 4BRevised Total Coliform Rulecode 8000NoResolved
2018-10-01MonitoringMonitoring, Routine (RTCR) · code 3ARevised Total Coliform Rulecode 8000NoResolved
2018-01-01Monitoring and reportingFollow-up Or Routine LCR Tap M/R · code 52Lead and Copper Rulecode 5000NoResolved
1997-10-01Monitoring and reportingMonitoring, Routine Major (TCR) · code 23Total coliform bacteria (TCR)code 3100NoArchived
1997-07-01Monitoring and reportingMonitoring, Routine Major (TCR) · code 23Total coliform bacteria (TCR)code 3100NoArchived
1995-04-01Monitoring and reportingMonitoring, Routine Major (TCR) · code 23Total coliform bacteria (TCR)code 3100NoArchived
1993-07-01Monitoring and reportingMonitoring, Routine Major (TCR) · code 23Total coliform bacteria (TCR)code 3100NoArchived
1992-04-01Monitoring and reportingMonitoring, Routine Major (TCR) · code 23Total coliform bacteria (TCR)code 3100NoArchived
1991-10-01Monitoring and reportingMonitoring, Routine Major (TCR) · code 23Total coliform bacteria (TCR)code 3100NoArchived

All 9 violations in EPA's records, newest first.Labels and codes come from EPA's SDWIS reference tables. A monitoring or reporting violation means a required test or report was missed or late; it does not by itself mean a contaminant was found. "Health-based" marks violations of a legal limit or required treatment.

Camp Long Leadership Center (0270678): frequently asked questions

Who runs Camp Long Leadership Center (0270678)?

Camp Long Leadership Center (0270678) (PWSID SC0270678) is a non-transient non-community water system privately owned. It is regulated by the SC state drinking water program.

How many people does Camp Long Leadership Center (0270678) serve?

Camp Long Leadership Center (0270678) reports serving 175 people through 42 service connections in Aiken County, South Carolina.

Where does Camp Long Leadership Center (0270678) get its water?

EPA SDWIS lists this system's primary water source as groundwater. Groundwater means the system draws its water from wells or springs fed by underground aquifers.

Does Camp Long Leadership Center (0270678) have any drinking water violations?

EPA's records list 9 violations for this system; none is health-based, and the most recent began in January 2025. A monitoring or reporting violation means a required test or report was missed or late; it does not by itself mean a contaminant was found.

Is Camp Long Leadership Center (0270678)'s water safe to drink?

AquaCensus shows EPA compliance records, not current water test results, so it cannot say whether the water is safe at a given moment. EPA's records list 9 violations for this system; none is health-based, and the most recent began in January 2025. For current results, consult EPA ECHO, or the SC state drinking water program.

Where can I find Camp Long Leadership Center (0270678)'s water quality report?

The annual Consumer Confidence Report requirement applies to community water systems. Camp Long Leadership Center (0270678) is a non-transient non-community water system, so it is not required to publish one; like every public water system, it must notify the people it serves about violations under EPA's public notification rules.

Other water systems in Aiken County

Water systemCountyPopulation servedTypeSource
Aiken City of (Sc0210001)Aiken51,533CommunitySurface water
North Augusta City of (Sc0210003)Aiken26,125CommunitySurface water
Breezy Hill W/D (Sc0220006)Aiken21,197CommunitySurface water
Beech Island W/D (Sc0220004)Aiken8,935CommunityGroundwater
Srns LLC A-Area (Sc0230501)Aiken8,700Non-transient non-communityGroundwater
Valley Psa (Sc0220012)Aiken7,752CommunityGroundwater

Related pages

Working with water-system records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: U.S. EPA Safe Drinking Water Information System (SDWIS) and SDWA violation records, via EPA ECHO, as published October 1, 2026 — AquaCensus refreshes it quarterly. See the methodology for how records are matched, cleaned and scored.

Cite as: AquaCensus, “Camp Long Leadership Center (0270678), PWSID SC0270678, South Carolina”, https://aquacensus.com/water-systems/south-carolina/camp-long-leadership-center-0270678-sc0270678 (data as of October 1, 2026).